" />

Job completed for Marc and Coleen S

Completion date: April 12, 2016

Location: West Hartford, CT

Why did the customer contact us?

Hartford Gas Boiler Install


Marc and Coleen called because of our positive reviews in the Hartford area. They called because a Climate Partners technician claimed to make a Saturday and Evening appointment. They needed a Saturday appointment because of the work schedule and they saw us with a long positive history. The call was answered immediately and the appointment was set within a few days. They needed a company to coordinate an asbestos company Gas Utility and Town building Inspector.

Solutions provided:

We presented a heating system that met their budget. They needed asbestos removal and a oil tank removed, so we presented the Energy Kinetics Accel CS 96% gas boiler and hot water heater system. We had the boiler and oil tank removed on the same day, and we had the gas utility show up and do a compete install of gas piping in the same day as the boiler install.


We presented the CT energize loan that allowed them to only pay 10% out of pocket and the rest was financed at a low 2.99%. With the new gas boiler savings over the old system and with the low monthly payment I was able to create a cash surplus monthly in their household budget. The Energy Kinetics state of the art energy savings is what gave them this savings opportunity. The CTEnergize loan program made it easy to apply and get.


Customer Testimonial


"The install team and Climate Partners took a complicated expensive job and turned it into a smooth low cost solution"

Photos & Videos:

old hot water heater

old hot water heater

Energy Kinetics Accel CS 96% gas boiler and hot water heater system

Energy Kinetics Accel CS 96% gas boiler and hot water heater system

Copyright © 2019 Climate Partners Hartford | All rights reserved.